cre8space Workspace Solutions
Homepage | Case studies | Blog | Contact us | Call 0151 513 6703

cre8space Blog

April 17, 2008

We Deliver to DHL On Time!

Filed under: Office Interiors — Tags: , — cre8space @ 12:33 pm

The Port of Liverpool Building stands majestically on the Mersey waterfront alongside the Liver Buildings and The Cunard Building. What better location for DHL Global Forwarding UK to set up their new Head Quarters. With such high ceilings and huge windows cre8space were given the challenge to install freestanding office partitions that allowed a feeling of ‘light and clarity’ so we used a frameless glass partition system with glass sliding doors. Other walls included low level standard stud walls blending in with the existing building. The overall effect was modern contemporary. All delivered and installed in just 2 weeks!